Take yourself to greater depths right from your desktop with SPE Webinars and Online Education.
Join our industry experts as they explore solutions to real problems and discuss trending topics.

Well Completion Design

Description:

Select the appropriate tubing and accessories for completing wells in keeping with the production method required for the reservoir, and to facilitate future workover, servicing and stimulation work.Upon completion of this module, the participant should be able to select the proper sizes and grades of tubulars to maintain the integrity of the wellbore and handle anticipated production, as well as select the downhole casing and tubing accessories needed to optimize production and future well work. 

Duration:  8 hours

Content:

  • Select Tubing; Casing and Bit Sizes
  • Select Production Casing String
  • Select Surface Casing String


0.8 CEUs offered.

Members : USD 115.00

Non-members : USD 150.00


Key:

Complete
Failed
Available
Locked
Drilling and Workover Fluids
Begin self-paced component package.
Begin self-paced component package. This course will take 480 minutes.
CEU
0.80 CEUs credits  |  Certificate available
0.80 CEUs credits  |  Certificate available CEUs offered.